Installation Instructions

Simple Quick-Start Guide

Simple Quick-Start Guide

Simple Quick-Start Guide

Set a solid foundation in a single day. Prepare your site before pickup, work safely with the driver and torque arm, then finish every screw to a consistent grade.


  1. Probe every planned location with 6-foot rebar

  2. Mark all footing or screw center points

  3. Set string line and a finished-grade reference

  4. Verify every driver, adapter, and torque-arm connection

  5. Start the screw in High Gear

  6. Shift to Low Gear when resistance increases

  7. Check grade before final depth

  8. Leave saddle bolts loose until posts and beams are level

  9. Tighten all final hardware after alignment

I. Pre-Rental Site Preparation

Probe each location for boulders or buried debris

Mark every footing center

Set string lines and finished grade

Relocate any spot that won’t install cleanly

Arrive with layout done — rental time is for driving screws

II. Site Layout

Confirm screw positions against the project layout

Use string line for straight rows and even spacing

Keep clear working room for driver, torque arm, and operator

III. Electric Driver Operation

Brace the torque arm before touching the trigger

Check driver, adapter, and bit connections

Wait 5 seconds after any trigger pull before restarting

If High / Low won’t shift, feather the trigger until it aligns

IV. Torque Arm & Driving

Pick a brace point with room for full arm retraction

Start in High Gear; shift to Low when the motor strains

Keep the screw plumb for the first 18–24 inches

Use Low Gear for final depth and grade only

Stop and relocate if the arm bottoms out or soil churns

V. Grade & Elevation Control

Verify grade with the survey rod on the torque-arm plate

Finish all screws at one laser or level reference

Make height corrections in Low Gear only

Follow the Five-Second Rule before re-triggering

VI. Saddles & Final Connections

Leave saddle bolts loose at first

Level posts and beams, then tighten the three set bolts

Add timber locks and through-bolts after alignment

VII. Field Notes

Finish probing, layout, and string lines before pickup

Set elevation references ahead of time

If you hit rock or debris, move to an alternate spot — don’t force it

VIII. Stop & Check

Stop if the arm runs out of retraction room

Stop if the screw loses plumb or the motor stalls repeatedly

Stop if material churns continuously at the surface

Re-check brace point, position, and soil before continuing